At the following location:
Road: N80 at Mountmellick.
From a point: Opposite Hinch’s Garage, Tullamore side of Mountmellick
To a point: 350m the Tullamore side of Hinch’s garage.
ON and/or BETWEEN the following dates & times:
14/11/17 08:00 and 08/12/17 18:00
For the purposes of installation of traffic calming measures, including new gateway island and signs. Installation of new kerbs and footpaths.
Any objections or observations shall be emailed to: dlalor@laoiscoco.ie or fnasiem@laoiscoco.ie
Leave a Reply